A big day. The hull release.

ReleaseThis is a really big day in the life of a boat. Here’s the hull being released from the hull mold. The Flag Blue gelcoat looks great as the part is released. Before lifting the hull, the team has gone in an laminated temporary lifting tabs inside the part to give them lifting points. The chain hoists are attached and the lifting starts. The part comes out easily because the draft or angle that is designed into the hull allows the part to come away from the mold easily.

Another beautiful Sabreline 38 Hard Top Express hull is ready to go into the production line.

Chart People often ask how precise the technique of laminating of boat hulls is. This chart is kept in our fiberglass department and is a record of the weights of all (in this case) Sabreline 38 Hard Top Express hulls. Keeping this record helps us to control the quality and ultimately the performance of our power boats.  Note that most hulls fall within a 100 lb window which represents a very small percentage of the overall weight of the vessel.

This entry was posted in Sabre Yachts Blog. Bookmark the permalink.